In addition to remote monitoring of datacenter spaces (i.e MATH, TEL, HASSHAAS, etc.), the IOC will perform routine in-person inspections of the physical facility(ies). These include (currently) MATH B60, MATH G109, MATH G190, and TEL.

Log each walkthrough in the IOC log, and indicate if DCM was emailed (or called, as the case may be). No email or call is needed if no issues are found. Whether or not follow-up email was sent, please select 'Yes' for the "Email?" option when making the log entry (examples near bottom of page).

Schedule:

Walk-throughs should be performed, everyday, once on first shift, and twice on subsequent shifts:

...

Email DCM after every walkthrough, even if nothing is found (specify that in the email). Log each walkthrough in the IOC log, and indicate that if DCM has been was emailed (or called, as the case may be). Whether or not follow-up email was sent, please select 'Yes' for the "Email?" option when making the log entry.

Image Added

EXAMPLE: 

Image Added

Image Added

If you are unsure about the severity of an issue, contact DCM via email or phone!