Safety Requirements

  1. Safety glasses/goggles must be worn at all times inside the cleanroom.
  2. Solvent gloves will be required during this procedure.  They can be found...
  3. Chemical SDS documentation can be found in the gowning room.

Check to make sure everything is in proper state before you start.

  • Pressure
  • Valve 1
  • Valve 2
  • Etc...

    Check to ensure the instrument is in the proper state before you start.

    1. The bell jar should be fully lowered onto the base.
    2. The ion gauge controller should be powered on, and indicate a pressure range of 3.0 x-6 or below.
      1. Image Added
    3. The TELEMARK crucible indexer should be powered on and indicate which source is positioned for deposition.
      1. Image Added
    4. The INFICON depositoin controller should be powered on and indicate READY
      1. Image Added
    5. The TELEMARK CHEETAH programmable sweep controller should be powered on...?
      1. Image Added
    6. The M.A.P.S. HTR Power Supply should be powered off.
      1. Image Added
    7. The TELEMARK TT-6 power supply should be off, with the main breaker in the down position
      1. Image Added
    8. Enter Name, Alias, Date, Description, and your Professor's name into the log sheet.
      1. Image Added

    Image Added