1. Lesker E-Beam Initial State Check

1. Lesker E-Beam Initial State Check

Check to ensure the instrument is in the proper state before you start.

  1. The bell jar should be fully lowered onto the base.
  2. The ion gauge controller should be powered on, and indicate a pressure range of 3.0 x-6 or below.
  3. The TELEMARK crucible indexer should be powered on and indicate which source is positioned for deposition.

  4. The INFICON depositoin controller should be powered on and indicate READY
  5. The TELEMARK CHEETAH programmable sweep controller should be powered on...?

  6. The M.A.P.S. HTR Power Supply should be powered off.
  7. The TELEMARK TT-6 power supply should be off, with the main breaker in the down position
  8. Enter Name, Alias, Date, Description, and your Professor's name into the log sheet.

Related content

7. Lesker E-Beam Evacuate to High Vacuum
7. Lesker E-Beam Evacuate to High Vacuum
More like this
9. Lesker E-Beam Material Deposition
9. Lesker E-Beam Material Deposition
More like this
8. Lesker E-Beam Inficon Controller Configuration
8. Lesker E-Beam Inficon Controller Configuration
More like this
2. Lesker E-Beam Vent Chamber to Atmosphere
2. Lesker E-Beam Vent Chamber to Atmosphere
More like this
SOP - JEOL JBX-8100FS E-Beam Writer
SOP - JEOL JBX-8100FS E-Beam Writer
More like this
New Editor SOP Copy - JEOL JBX-8100FS E-Beam Writer
New Editor SOP Copy - JEOL JBX-8100FS E-Beam Writer
More like this