Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 18 Current »

2024-12-20 to 2025-01-02: Reduced Holiday Operations

Dear Birck Research Community,

The Purdue winter recess begins effective Friday afternoon December 20th and concludes Thursday morning, January 2. The university is officially closed during this time. As we have done in past years, the Birck Nanotechnology Center will remain available for research but will be unstaffed and hazardous gasses will be unavailable. Lab work may otherwise proceed, though any fume hood work must be done with someone else present in the same laboratory or cleanroom bay (the "buddy" system). Click the link above to get more detail about equipment conditions and rules.


Refer to the Material and Process Compatibility page for information on materials compatible with this tool.
Equipment Status: Set as UP, PROBLEM, or DOWN, and report the issue date (MM/DD) and a brief description. Italicized fields will be filled in by BNC Staff in response to issues. See Problem Reporting Guide for more info.

StatusUP
Issue Date and Description


Estimated Fix Date and Comment

Responding Staff

/wiki/spaces/BNCWiki/pages/6236754

/wiki/spaces/BNCWiki/pages/6254010

 

iLab Name: C - Roll to Roll System (Clean room)
iLab Kiosk: BRK Roll to Roll Technology Core
FIC:
Miko Cakmak
Owner:
Guy Telesnicki
Location:
Cleanroom - E Bay
Maximum Wafer Size: 
N/A

Overview

General Description

Specifications

Technology Overview

 

Special gowning protocols must be followed for E-Bay

Sample Requirements and Preparation



Standard Operating Procedure


Questions & Troubleshooting



Process Library


References

Maxwell Manual

ChapterTopicFile
1Safety



2General Description
3Unwind Module
4Doctor Blade
5Electrospinning Cabinet
6Extruder
7High Voltage Electric Field System
8Heater Plates
9Laser
10Magnet
11UV Lamp
12Ovens
13Main Operator Panel
14Belt Drive
15Belt Trackers
16Rewind Module
17Wiring Diagrams
18Air and Gas Piping
19Water Piping
20Thread-Up Procedure
21Overall Machine Dimensions
22Notes
AddendumWiring diagram for Edge Guide Controllers (AutoCAD drawing)

In-line Measurement System References

Connection Diagram for In-line Measurement System Components:

Slot-Die Coating - manuals

Syringe Pump w/ Flow Rate Control: KDS Model 410 Series_5605-001REVH.pdf

  • No labels