Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

2024-12-20 to 2025-01-02: Reduced Holiday Operations

Dear Birck Research Community,

The Purdue winter recess begins effective Friday afternoon December 20th and concludes Thursday morning, January 2. The university is officially closed during this time. As we have done in past years, the Birck Nanotechnology Center will remain available for research but will be unstaffed and hazardous gasses will be unavailable. Lab work may otherwise proceed, though any fume hood work must be done with someone else present in the same laboratory or cleanroom bay (the "buddy" system). Click the link above to get more detail about equipment conditions and rules.


Refer to the Material and Process Compatibility page for information on materials compatible with this tool.
Equipment Status: Set as UP, PROBLEM, or DOWN, and report the issue date (MM/DD) and a brief description. Italicized fields will be filled in by BNC Staff in response to issues. See Problem Reporting Guide for more info.

StatusUP
Issue Date and Description


Estimated Fix Date and Comment

Responding Staff


iLab Name: T64000 Raman
iLab Kiosk:
 BRK Metrology Core
FIC: Vladimir Shalaev
Owner: Alexei Lagoutchev
Location:
BRK 1273
Maximum Wafer Size: 

Overview

General Description

Microscope-coupled triple monochromator with first two stages in double-subtractive configuration and LN2 cooled CCD detector

Specifications

Raman spectroscopy with exceptionally low (5cm-1) frequency reach, excitation wavelengths across visible spectrum

Technology Overview - Remove if multiple tools use the same technology/process

 

 

Sample Requirements and Preparation

 

Standard Operating Procedure


Questions & Troubleshooting


 

Process Library


References

 

  • No labels