Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 22 Next »


2024-12-20 to 2025-01-02: Reduced Holiday Operations

Dear Birck Research Community,

The Purdue winter recess begins effective Friday afternoon December 20th and concludes Thursday morning, January 2. The university is officially closed during this time. As we have done in past years, the Birck Nanotechnology Center will remain available for research but will be unstaffed and hazardous gasses will be unavailable. Lab work may otherwise proceed, though any fume hood work must be done with someone else present in the same laboratory or cleanroom bay (the "buddy" system). Click the link above to get more detail about equipment conditions and rules.


Refer to the Material and Process Compatibility page for information on materials compatible with this tool.
Equipment Status: Set as UP, PROBLEM, or DOWN, and report the issue date (MM/DD) and a brief description. Italicized fields will be filled in by BNC Staff in response to issues. See Problem Reporting Guide for more info.

StatusDOWN
Issue Date and Description

Pump keeps failing.

Estimated Fix Date and Comment

Investigating cause. TBD

Responding StaffR. Hosler


Specialty furnace/RF power source combination.

SOP:

2D-CVD SOP (Aug 2020).pdf

iLabs Link:

H2S CVD Furnace



  • No labels