Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Table of Contents




VTI Glove Box Maintenance Schedule

Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2019/06/10241 weekVTI Glovebox / ALDVTI Glovebox

Check moisture and O2 levels, regenerate / purge as necessary



Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2019/06/10241 weekVTI Glovebox / ALDVTI Glovebox

Perform 1 min leak test. Should be < 0.1 vol%/hr.



Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2019/08/283 monthsVTI Glovebox / ALDVTI Glovebox

Perform moisture analyzer maintenance



Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2019/08/283 monthsVTI Glovebox / ALDVTI Glovebox

Gloves and glove O-rings should be changed once every (3) months or as needed based on the condition.



Parts Required


Gloves, Left/Right, 1 pair (Universal can be used in any Glovebox); 2 pair required





Glove O-Rings (4 per pair of gloves); 2 sets required




Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2019/11/296 monthsVTI Glovebox / ALDVTI Glovebox

The inlet/outlet filters should be replaced every (6) months.



Parts Required


Inlet/Outlet HEPA Filter



Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2020/04/2912 monthsVTI Glovebox / ALDVTI Glovebox

The large antechamber door O-rings should be replaced every year.



Parts Required


Large Antechamber Door O-Ring (2 per door)



Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2020/04/2912 monthsVTI Glovebox / ALDVTI Glovebox

The small antechamber door O-rings should be replaced every year.



Parts Required


Small Antechamber Door O-Ring (2 per door)




EBARA EV-A10-P Pump Maintenance Schedule

Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2019/0607/10011 weekLC Glovebox / ALD(3) EBARA EV-A10-P Pump

Check for Alarm Signal on Pump



Page Properties


Next Due DateIntervalSystemSubsystemMaintenance Description
2019/07/101 monthLC Glovebox / ALD(3) EBARA EV-A10-P Pump

Check Oil level



Parts Required

C-0402-000-0111

BARRIERRTA J100ES Lubricant oil