VTI Glovebox and Gemstar ALD Maintenance Schedule

VTI Glovebox and Gemstar ALD Maintenance Schedule






VTI Glove Box Maintenance Schedule

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2019/07/01

1 week

VTI Glovebox / ALD

VTI Glovebox

Check moisture and O2 levels, regenerate / purge as necessary

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2019/07/01

1 week

VTI Glovebox / ALD

VTI Glovebox

Perform 1 min leak test. Should be < 0.1 vol%/hr.

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2019/08/28

3 months

VTI Glovebox / ALD

VTI Glovebox

Perform moisture analyzer maintenance

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2019/08/28

3 months

VTI Glovebox / ALD

VTI Glovebox

Gloves and glove O-rings should be changed once every (3) months or as needed based on the condition.





Parts Required



Gloves, Left/Right, 1 pair (Universal can be used in any Glovebox); 2 pair required









Glove O-Rings (4 per pair of gloves); 2 sets required



Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2019/11/29

6 months

VTI Glovebox / ALD

VTI Glovebox

The inlet/outlet filters should be replaced every (6) months.





Parts Required



Inlet/Outlet HEPA Filter

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2020/04/29

12 months

VTI Glovebox / ALD

VTI Glovebox

The large antechamber door O-rings should be replaced every year.





Parts Required



Large Antechamber Door O-Ring (2 per door)

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2020/04/29

12 months

VTI Glovebox / ALD

VTI Glovebox

The small antechamber door O-rings should be replaced every year.





Parts Required



Small Antechamber Door O-Ring (2 per door)


EBARA EV-A10-P Pump Maintenance Schedule

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2019/07/01

1 week

LC Glovebox / ALD

(3) EBARA EV-A10-P Pump

Check for Alarm Signal on Pump

Next Due Date

Interval

System

Subsystem

Maintenance Description

Next Due Date

Interval

System

Subsystem

Maintenance Description

2019/07/10

1 month

LC Glovebox / ALD

(3) EBARA EV-A10-P Pump

Check Oil level





Parts Required

C-0402-000-0111

BARRIERRTA J100ES Lubricant oil