Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Check to

...

ensure the instrument is in the proper state before you start.

  1. The bell jar should be fully lowered onto the base.
  2. The ion gauge controller should be powered on, and indicate a pressure range of 3.0 x-6 or below.

...

    1. Image Added
  1. The TELEMARK crucible indexer should be powered on and indicate which source is positioned for deposition.
    1. Image Added
  2. The INFICON depositoin controller should be powered on and indicate READY
    1. Image Added
  3. The TELEMARK CHEETAH programmable sweep controller should be powered on...?
    1. Image Added
  4. The M.A.P.S. HTR Power Supply should be powered off.
    1. Image Added
  5. The TELEMARK TT-6 power supply should be off, with the main breaker in the down position
    1. Image Added
  6. Enter Name, Alias, Date, Description, and your Professor's name into the log sheet.
    1. Image Added

Image Added