/
Lesker Kiosk Home Page
Lesker Kiosk Home Page
Process Overview
- 1. Lesker E-Beam Initial State Check
- 2. Lesker E-Beam Vent Chamber to Atmosphere
- 3. Lesker E-Beam Raise the Bell Jar
- 4. Lesker E-Beam Sample Loading
- 5. Lesker E-Beam Lowering the Bell Jar
- 6. Lesker E-Beam Evacuate to Low Vacuum
- 7. Lesker E-Beam Evacuate to High Vacuum
- 8. Lesker E-Beam Inficon Controller Configuration
- 9. Lesker E-Beam Material Deposition
Source Materials
- Titanium
- Chromium
- Nickel
- Gold
- Palladium
- Molybdenum
- Aluminum
- Platinum
This list represents the full tool capability. Not all sources are installed at one time. Source changes require at least 24 hours notice, and all sources will be supplied by Birck. A list of currently installed source materials can be found here.
, multiple selections available,
Related content
Lesker E-Beam Evaporator - Flexible Substrate Compatible
Lesker E-Beam Evaporator - Flexible Substrate Compatible
Read with this
LPKF Press
LPKF Press
More like this
PVD E-Beam Evaporator - Metal/Magnetic Sources
PVD E-Beam Evaporator - Metal/Magnetic Sources
Read with this
Deposition
Deposition
More like this
PVD E-Beam Evaporator - Glancing Angle Deposition (GLAD)
PVD E-Beam Evaporator - Glancing Angle Deposition (GLAD)
Read with this
LPKF Mill
LPKF Mill
More like this