Check to
ensure the instrument is in the proper state before you start.
- The bell jar should be fully lowered onto the base.
- The ion gauge controller should be powered on, and indicate a pressure range of 3.0 x-6 or below.
- The TELEMARK crucible indexer should be powered on and indicate which source is positioned for deposition.
- The INFICON depositoin controller should be powered on and indicate READY
- The TELEMARK CHEETAH programmable sweep controller should be powered on...?
- The M.A.P.S. HTR Power Supply should be powered off.
- The TELEMARK TT-6 power supply should be off, with the main breaker in the down position
- Enter Name, Alias, Date, Description, and your Professor's name into the log sheet.