Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  • Turn off ion gage
  • close gate valve
  • Open vent valve
    1. Read the pressure from the Ion Gauge Controller and record as "Chamber pressure before venting" in the log sheet. Turn the Ion Gauge Controller OFF by pressing the button labeled |ON one time.
      1. Image Added
      2. Image Added
      3. Image Added
    2. Locate the Gate Valve handle, rotate the knob clockwise until the handle feels tight and locks into place.
      1. Image Added
    3. Locate the Vent valve knob, slowly rotate the knob counter clockwise until the knob stops.  
      1. Image Added
    4. Venting will take 2-3 minutes.  Venting is complete when a small gap forms between the bell jar and the base.
      1. Need an image of this...


    Image Added