/
2. Lesker E-Beam Vent Chamber to Atmosphere
2. Lesker E-Beam Vent Chamber to Atmosphere
- Read the pressure from the Ion Gauge Controller and record as "Chamber pressure before venting" in the log sheet. Turn the Ion Gauge Controller OFF by pressing the button labeled |ON one time.
- Locate the Gate Valve handle, rotate the knob clockwise until the handle feels tight and locks into place.
- Locate the Vent valve knob, slowly rotate the knob counter clockwise until the knob stops.
- Venting will take 2-3 minutes. Venting is complete when a small gap forms between the bell jar and the base.
- Need an image of this...
, multiple selections available,
Related content
7. Lesker E-Beam Evacuate to High Vacuum
7. Lesker E-Beam Evacuate to High Vacuum
More like this
1. Lesker E-Beam Initial State Check
1. Lesker E-Beam Initial State Check
More like this
8. Lesker E-Beam Inficon Controller Configuration
8. Lesker E-Beam Inficon Controller Configuration
More like this
LC Tech Glovebox and ALD Systems
LC Tech Glovebox and ALD Systems
More like this
9. Lesker E-Beam Material Deposition
9. Lesker E-Beam Material Deposition
More like this
Tube 05 Anneal
Tube 05 Anneal
More like this