Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  1. Read the pressure from the Ion Gauge Controller and record as "Chamber pressure before venting" in the log sheet. Turn the Ion Gauge Controller OFF by pressing the button labeled |ON one time.
    1. Image Added
  2. Locate the Gate Valve handle, rotate the knob clockwise until the handle feels tight and locks into place.
    1. Image RemovedImage Added
  3. Locate the Vent valve knob, slowly rotate the knob counter clockwise until the knob stops.  
    1. Image RemovedImage Added
  4. Venting will take 2-3 minutes.  Venting is complete when a small gap forms between the bell jar and the base.
    1. Need an image of this...