Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

2024-12-20 to 2025-01-02: Reduced Holiday Operations

Dear Birck Research Community,

The Purdue winter recess begins effective Friday afternoon December 20th and concludes Thursday morning, January 2. The university is officially closed during this time. As we have done in past years, the Birck Nanotechnology Center will remain available for research but will be unstaffed and hazardous gasses will be unavailable. Lab work may otherwise proceed, though any fume hood work must be done with someone else present in the same laboratory or cleanroom bay (the "buddy" system). Click the link above to get more detail about equipment conditions and rules.


Refer to the Material and Process Compatibility page for information on materials compatible with this tool.
Equipment Status: Set as UP, PROBLEM, or DOWN, and report the issue date (MM/DD) and a brief description. Italicized fields will be filled in by BNC Staff in response to issues. See Problem Reporting Guide for more info.

Status

DOWN

IssuePump has arrived, pending install.
Estimated Resolution Timeframe

 


iLab Name: C - Tube 06 Polysilicon
iLab Kiosk: BRK Furnace Core
FIC:
 Shared
Owner: Rich Hosler
Location:
Cleanroom - R Bay
Maximum Wafer Size: 
6"/150 mm (for all furnaces)

Overview

General Description

Horizontal furnaces for a variety of processes.

Specifications

Process Capabilities:

  • Tube 06 - Polysilicon

Process Temperatures:

  • Tube 06 - 650°C maximum

Technology Overview 

 

Sample Requirements and Preparation

 

Standard Operating Procedure


Questions & Troubleshooting


 

Process Library


References

 

  • No labels