Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 10 Next »

Check to ensure the instrument is in the proper state before you start.

  1. The bell jar should be fully lowered onto the base.
  2. The ion gauge controller should be powered on, and indicate a pressure range of X.X - 08 or below.
  3. The TELEMARK crucible indexer should be powered on and indicate which source is positioned for deposition.

  4. The INFICON depositoin controller should be powered on and indicate READY
  5. The TELEMARK CHEETAH programmable sweep controller should be powered on...?

  6. The M.A.P.S. HTR Power Supply should be powered off.
  7. The TELEMARK TT-6 power supply should be off, with the main breaker in the down position

  • No labels