K and S 4526 Wire Bonder

2024-12-20 to 2025-01-02: Reduced Holiday Operations

Dear Birck Research Community,

The Purdue winter recess begins effective Friday afternoon December 20th and concludes Thursday morning, January 2. The university is officially closed during this time. As we have done in past years, the Birck Nanotechnology Center will remain available for research but will be unstaffed and hazardous gasses will be unavailable. Lab work may otherwise proceed, though any fume hood work must be done with someone else present in the same laboratory or cleanroom bay (the "buddy" system). Click the link above to get more detail about equipment conditions and rules.


Refer to the Material and Process Compatibility page for information on materials compatible with this tool.
Equipment Status: Set as UP, PROBLEM, or DOWN, and report the issue date (MM/DD) and a brief description. Italicized fields will be filled in by BNC Staff in response to issues. See Problem Reporting Guide for more info.

StatusShutdown - Longterm
Issue Date and Description


Estimated Fix Date and Comment
Controller board issue
Responding StaffTim Miller


iLab Name: K and S 4526
iLab Kiosk: BRK Packaging and Assembly Core
FIC:
David Janes
Owner: Tim Miller
Location:
BRK 2261
Maximum Wafer Size: 

Overview

General Description

These systems use gold wire to bond. The pad surfaces to be bonded must be compatible with gold or the bonds will not stick. Gold, copper, anuminum, or silver work well. Titanium, ITO, and diamond can not be wire bonded

Specifications

The West Bond bonder has 25 micron gold wire and is operated manually. The K&S bonder has a wire size of 125 microns by 25 microns and may be operated manually or by programming. The pads must be larger than the size of a wire bond foot. Wire bond feet are typically 50 microns in width and 75 microns long. The recommended pads are 100 x100 microns minimum size on both chip and package for the West Bond. 100 x 150 microns for the K&S Ribbon Bonder.

Technology Overview - Remove if multiple tools use the same technology/process

 

 

Sample Requirements and Preparation

 

Standard Operating Procedure


Questions & Troubleshooting


 

Process Library


References