Tube 03 LTO Dep
Status | DOWN |
Issue Date and Description | Decommissioning |
Estimated Fix Date and Comment | ETA Feb 2026 |
Responding Staff | R. Hosler |
THIS TUBE IS CURRENTLY NOT IN OPERATION WHILE THE EXPERTECH FURNACES THAT WILL REPLACE THEM ARE BEING INSTALLED.
ESTIMATED INSTALLATION READYNESS IS OCTOBER 2025.
Protemp Horizontal Furnace - Tube 03 - Low Temperature Oxide Deposition
iLab Name: C - Tube 03 LTO Dep
iLab Kiosk: BRK Furnace Core
FIC: Shared
Owner: Rich Hosler
Location: Cleanroom - R Bay
Maximum Wafer Size: 6"/150 mm (for all furnaces)
Overview
General Description
Horizontal furnaces for a variety of processes.
Specifications
Process Capabilities:
Tube 03 - Low Temperature Oxidation (deposition)
Process Temperatures:
Tube 03 - 400°C maximum
Standard Operating Procedure
- CVD