/
8. Lesker E-Beam Inficon Controller Configuration

8. Lesker E-Beam Inficon Controller Configuration

  1. From the main screen, press the menu button.
  2. Scroll down to film parameter, press menu
  3. Go to source screen, enter density and z-ratio for desired material
  4. Go to senso menu, enter tooling factor for desired material
  5. Scroll to the left press menu
  6. Scroll up to operate
  7. Press menu to return to main screen
  8. Turn on High Voltage switch on the power supply, wait 2 minutes.


Related content

9. Lesker E-Beam Material Deposition
9. Lesker E-Beam Material Deposition
More like this
7. Lesker E-Beam Evacuate to High Vacuum
7. Lesker E-Beam Evacuate to High Vacuum
More like this
1. Lesker E-Beam Initial State Check
1. Lesker E-Beam Initial State Check
More like this
2. Lesker E-Beam Vent Chamber to Atmosphere
2. Lesker E-Beam Vent Chamber to Atmosphere
More like this
Raith eLine E-Beam Writer
Raith eLine E-Beam Writer
More like this
SOP - JEOL JBX-8100FS E-Beam Writer
SOP - JEOL JBX-8100FS E-Beam Writer
More like this