/
6. Lesker E-Beam Evacuate to Low Vacuum

6. Lesker E-Beam Evacuate to Low Vacuum

  1. Close the vent valve
  2. Open the rough valve
  3. Wait for pressure to drop below 5 x 10-2 torr (50 mTorr)


Related content

7. Lesker E-Beam Evacuate to High Vacuum
7. Lesker E-Beam Evacuate to High Vacuum
More like this
2. Lesker E-Beam Vent Chamber to Atmosphere
2. Lesker E-Beam Vent Chamber to Atmosphere
More like this
1. Lesker E-Beam Initial State Check
1. Lesker E-Beam Initial State Check
More like this
8. Lesker E-Beam Inficon Controller Configuration
8. Lesker E-Beam Inficon Controller Configuration
More like this
9. Lesker E-Beam Material Deposition
9. Lesker E-Beam Material Deposition
More like this
PVD E-Beam Evaporator - Glancing Angle Deposition (GLAD)
PVD E-Beam Evaporator - Glancing Angle Deposition (GLAD)
More like this