7. Lesker E-Beam Evacuate to High Vacuum

  1. Close the rough valve
  2. Open the gate valve
  3. Wait for 5 minutes
  4. Turn on the ion gage, record initial pressure
  5. Wait for the pressure to fall below 3 x 10-6 Torr