/
7. Lesker E-Beam Evacuate to High Vacuum
7. Lesker E-Beam Evacuate to High Vacuum
- Close the rough valve
- Open the gate valve
- Wait for 5 minutes
- Turn on the ion gage, record initial pressure
- Wait for the pressure to fall below 3 x 10-6 Torr
, multiple selections available,
Related content
CHA E-Beam Evaporator #1
CHA E-Beam Evaporator #1
More like this
CHA E-Beam Evaporator #2
CHA E-Beam Evaporator #2
More like this
Lesker E-Beam Evaporator - Flexible Substrate Compatible
Lesker E-Beam Evaporator - Flexible Substrate Compatible
More like this
SOP - JEOL JBX-8100FS E-Beam Writer
SOP - JEOL JBX-8100FS E-Beam Writer
More like this
PVD E-Beam Evaporator - Metal/Magnetic Sources
PVD E-Beam Evaporator - Metal/Magnetic Sources
More like this
PVD E-Beam Evaporator - Glancing Angle Deposition (GLAD)
PVD E-Beam Evaporator - Glancing Angle Deposition (GLAD)
More like this